Before any wall is cut: mapping every run
The job starts with a walk through the house. Every fixture gets counted: sinks, toilets, tubs, showers, the washer box, the water heater, the ice maker line, every hose bib outside. The point is to know where each line has to end up and how the new pipe will get there.
The attic decides most of it. We look at the access, the headroom, the insulation, which way the ceiling framing runs, and whether the space above each wet wall can be reached. A bathroom wall with open attic above it is a simple drop. One under a low section of roof, or under a finished room on a two-story house, takes more openings and more time.
That walk produces a route for each line and a list of where the drywall will be opened. You should see that list before work starts. A contractor who cannot tell you roughly which walls get opened has not planned the job yet.
Then clear those walls. Furniture, pictures, the vanity cabinets, everything under the kitchen sink. The crew will move things if they have to, but your things are safer moved by you.
Access holes, not torn-out walls
A repipe opens drywall in specific places. It does not strip rooms to the studs. There is an opening behind or beside each fixture where the new line connects, and sometimes one near the ceiling where a line drops from the attic and has to pass through the top of the wall framing.
The openings are cut as small as the work allows and cut square, because a clean square hole patches flat and a ragged one does not. Where a shower valve sits behind tile, access usually comes from the other side of that wall, through a closet or a bedroom, so the tile stays untouched. When the tile is the only way in, you hear that before the job, not during it.
Floors get covered, the rooms being worked in get plastic, and the return vents nearby get sealed off. There will still be some dust. Nobody cuts drywall in an occupied house without making some.
Running the new lines and tying in fixture by fixture
The new system goes in alongside the old one, and the old one stays live while it does. Lines are pulled through the attic, insulated, strapped, and fished down inside the walls to each opening. For most of this stage the house still has water through the old pipe.
The water goes off at tie-in. Each fixture is cut off the old line and connected to the new one, usually with a new shutoff valve under it. That gets done in groups, one bathroom, then the kitchen, then the laundry, so the water is off for a stretch of the working day rather than for the whole job.
The aim is a house with working water every night. On a job that runs more than one day, that means whatever has been switched over runs on the new lines and the rest stays on the old ones until its turn. Ask any contractor how they stage this. Water off for part of the afternoon and no water until the job is finished are very different weeks to live through.
Once every fixture is on the new system, the old pipe is cut at the main and capped. Where it can be reached it comes out. Where it is buried in the slab or closed up in a wall, it is left in place, empty and disconnected. On days the water will be off, fill a few jugs and a pot for the stove before the crew arrives.
The question worth asking is not how long a repipe takes. It is whether the family has a working shower every night while it happens.
Pressure testing and what gets inspected
Before any wall is closed, the new system is pressure tested. The lines are charged, isolated, and watched for any drop over a set period. A joint that is going to leak does it now, with the wall open and the crew standing there, and not after the patch is painted.
A whole house repipe is permitted work. Pipe Perfect LLC is a Florida Certified Plumbing Contractor, license CFC1431903, and the permit is pulled under that license. The inspection is done by an inspector from the local building department, which is Pasco County or the city depending on where the house sits. They look at the work while the walls are still open and again when it is finished. We do the plumbing and schedule the inspection. We do not perform it and we do not sign it off.
This is why the holes stay open for a while. Nothing gets patched until the inspection passes, and the inspector's schedule belongs to the building department, not to us. We do not know in advance whether that is the next morning or a few days later.
If your insurer asks for a four-point inspection or anything similar after the repipe, that is a separate inspection by someone licensed to do it. We are a plumbing contractor and nothing else, and we do not perform or sign any inspection that needs a license we do not hold.
How long the house is a worksite, and who patches and paints
We do not give a number of days before walking the house. It depends on the fixture count, one story or two, the attic, and how much of the run can go overhead. What we can tell you is the shape of it. First comes the plumbing stage, the loud one, with the water going off in parts of the day. Then the walls sit open waiting for the inspection. Then the patching, which is a separate and quieter visit.
Patching means filling each opening with new drywall, taping it, finishing it, sanding it, and matching the existing texture, whether that is knockdown, orange peel or smooth. Some contractors include patch and texture. Some leave the openings clean and square for your own drywall finisher. Neither is wrong. What matters is that it is in the written scope before work starts, so nobody is surprised by open holes on the last day.
Paint is usually the homeowner's. A patch will show through until it is painted, and touching up only the patch rarely matches paint that has been on the wall for years. Plan on painting each opened wall corner to corner, or the whole room if the color is old. Ask who is painting at the same time you ask who is patching.